question

michael.smith avatar image
0 Likes"
michael.smith asked michael.smith commented

Positioning of Decision Point on Conveyor

When a part crosses the decision point which part of the decision point triggers each action, also when using a decision point near a conveyor join how close can the decision point be to the join?

conveyordecision points
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Phil BoBo avatar image
1 Like"
Phil BoBo answered michael.smith commented

A decision point is a single point. It isn't an area with "parts." The center of its symbol is the point.

When the specified edge of an item arrives at that point, it fires the On Arrival event. When the specified edge of an item leaves that point, it fires the On Continue event.

Decision points can be anywhere on the conveyor system. "How close" can be 0.


decision-point.png (48.3 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

michael.smith avatar image michael.smith commented ·

Thanks for the clarification Phil

0 Likes 0 ·
David Seo avatar image
0 Likes"
David Seo answered David Seo edited

@michael.smith

What you want to know about decision point behaviour, when the flow item arrives DP, On Arrival trigger fire and next when leave the DP, On Continue trigger fires. Is that your question?

I am not sure of your meaning of 'conveyor join' but if it means joining for branching or sorting, the decision point location should not be over the center line of the joined conveyor.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.