Hello,
We have an issue that we can't solve. It is summarized as follows (see the image and Flexim example attached):
In the right column, the token in the activity "Wait_1" should wait until its twin token (left column) should be in the activity "Wait for 3".
In the left column, the token in the activity "Wait for 3" should wait until its twin token (right column) leaves the activity "3".
Is it possible to point to a token in the Process Flow to be able to synchronize the two "Wait for Events"?