question

Daniel A7 avatar image
0 Likes"
Daniel A7 asked Jason Lightfoot edited

SPLIT TOKEN REFERENCE

Hello,

We have an issue that we can't solve. It is summarized as follows (see the image and Flexim example attached):

In the right column, the token in the activity "Wait_1" should wait until its twin token (left column) should be in the activity "Wait for 3".

In the left column, the token in the activity "Wait for 3" should wait until its twin token (right column) leaves the activity "3".

Is it possible to point to a token in the Process Flow to be able to synchronize the two "Wait for Events"?

example.fsm

FlexSim 18.1.1
wait for eventtokensplitsynchronize
example.png (16.4 KiB)
example.fsm (20.1 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Marcello Rosadini avatar image
2 Likes"
Marcello Rosadini answered Jason Lightfoot edited

Dani,

there is a synchronize activity in process flow. Have you tried using that?

From your description, it should look something like this:


captura.png (85.1 KiB)
· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Daniel A7 avatar image Daniel A7 commented ·

Thank you Marcello. It has been really helpful and what we where looking for.

0 Likes 0 ·
Jason Lightfoot avatar image Jason Lightfoot ♦♦ Daniel A7 commented ·

You can also use lists and preserve the look of the original flow. Model attached that has both.

syncvslists.fsm

0 Likes 0 ·
syncvslists.fsm (24.1 KiB)
syncvslist.png (13.4 KiB)