The Problem is, that your trucks (in FlexSims tree structure) never leave your Queue (Truck Origin). In this Queue you´ve set (per default) "Stuck inside Queue". So at first I would turn this off (into "do nothing"). And than you should wait until your trucks arrived on your Aim Destination before you can use a "Move Object" Activity to move the truck into the rack (in FlexSims tree structure).
So what you are looking for, I´ve tryed to implement into the attached model.
I only use standard Options in FlexSim.
First I´ve added an "A" Connection between your Queues and also connected the Networknodes to the Queues. I also connected the Queue and the Rack via A Connection and added further Networknodes that have to be connected. The Connection between both networks is an "D" Connection (this allows TE to leave a network on one point and enter it on another NN later on).
In your second Queue I also choosed the Pickoption in the Flow Tab to make the trucks drive to the Rack.
Hi @Karen E
Does Sebastian's answer help solve your problem? If so, please click the Accept button below the answer.
Thank you
HI,
I did not use process flow. but done the model of truck parking in normal conventional method.
hope this helps you
16 People are following this question.
© 1993- FlexSim Software Products, Inc. All Rights Reserved.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.