question

Arimba W avatar image
0 Likes"
Arimba W asked Joshua S answered

Production Scheduling (EDD, SPT) using Flexsim

Hi there, I'd like to ask, so i have the production scheduling on each machine for every job, here i'm applying dispatching rules: EDD and SPT. The system is jobshop. Unfortunately, I find it hard to assign my scheduling results to the Flexsim model to assess the result.

Here's my initial model dataset-2.fsm based on jobshop tutorial (https://answers.flexsim.com/articles/22945/list-examples-6.html).

Thank you very much for the help.

FlexSim 18.2.2
simulating production schedules
dataset-2.fsm (26.4 KiB)
· 5
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joshua S avatar image
0 Likes"
Joshua S answered

See this Post for the continuation and solution to this question.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.