Hi there, I'd like to ask, so i have the production scheduling on each machine for every job, here i'm applying dispatching rules: EDD and SPT. The system is jobshop. Unfortunately, I find it hard to assign my scheduling results to the Flexsim model to assess the result.
Here's my initial model dataset-2.fsm based on jobshop tutorial (https://answers.flexsim.com/articles/22945/list-examples-6.html).
Thank you very much for the help.