I'm trying to run an experiment varying setup times, inter-arrival times and number of shifts worked by the operator. I have setup times in a matrix (using the to-from for different setup times depending on what item type ran previously), the operator is linked to a time table, I would like to test having an operator at the machine for 8 or 16 hours a day, and the inter arrival times are each linked to individual sources.