ASRS task sequence with PF

Hi all,

I am trying the following task sequence with no success so far. I need that after my separator create 2 items, the ASRS load both of them at once and then unload one to one specific queue called "Piezas Merma" and then unload the remaining piece to another queue called "Entrada Conveyor". I made the following PF but it is performing something different that I need. I attached the model thanks in advance for your support.

con-asrs.fsm

Alejandro

FlexSim 18.2.0
process flowtask sequence
1.png (29.8 KiB)
con-asrs.fsm (367.0 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Joshua S avatar image
1 Like"
Joshua S answered Victor Alejandro HT commented

You were referencing token.item still when you were telling it to load, which referencing the object created in the beginning of the process flow create object activity. You needed a way to reference the objects you pulled from the list. I made the changes to your model, any changes I made are found in these activities: Carga, Descarga 1 en piezas merma,Descarga 1 en Entrada Conveyor

16321-con-asrs.fsm


16321-con-asrs.fsm (367.6 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Victor Alejandro HT avatar image Victor Alejandro HT commented ·

I see your point, thank you for your support @Joshua S. Now is working the way I need.