Inspection based on a specific time with PF

Hello everyone,

I need that approximately every 2.66 hours (3 x shift) one item go to an inspection station (Durómetro) and then go back to continue with the flow, starting with the first item. I made a PF but it is only recognizing the first item going to the inspection station, I can not find the way to make the rest of the items continue with the normal flow. I tried with different event triggered sources and wait for event setps with no succes. I attached the model, thanks for your support.

inspeccion-con-base-a-tiempo.fsm

Alejandro

FlexSim 18.2.3
pfrouting logic
1.png (244.7 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Victor Alejandro HT avatar image
0 Likes"
Victor Alejandro HT answered

Hello,

I made a change in my PF and finally got what I need. I use a delay, decide and a wait for event step to make the token wait until the process time ends before moving the item and trigger another logic in the model. I attached the solution, if someone need it.

Alejandro

inspeccion-con-base-a-tiempo.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.