Hello everyone,
I need that approximately every 2.66 hours (3 x shift) one item go to an inspection station (Durómetro) and then go back to continue with the flow, starting with the first item. I made a PF but it is only recognizing the first item going to the inspection station, I can not find the way to make the rest of the items continue with the normal flow. I tried with different event triggered sources and wait for event setps with no succes. I attached the model, thanks for your support.
inspeccion-con-base-a-tiempo.fsm
Alejandro