My model consists of 3 lines, i have demand per shift (ton/shift) shown in the attached excel sheet, that i need to simulate, each day consists of 3 shifts, each shift is 8 hours, i want to run this model for 60 shifts (continuously), and i need to make sure that each throughput (box) is in tonnes, so if the target of the first shift for the first line is 5 ton/shift, i'll find at the racks 5 boxes.
Please let us know if you can help :)