Hi all,
in my model is a 3-shift operation simulated which produces the same kind of parts in every shift. I got no time table integrated in my model because the machineries are not running in the breaks. I reduce my total running time of 3 shifts (480 min) about 135 (45 minutes break per shift) which results a simulation duration of 345 min = 20700 seconds. My model consists of a source, a queue, two processors and one sink. In every shift should two products after processing be send in to a third processor and not the sink. That third processor will simulate the "quality control". Furthermore should every four months a product be send in this quality control.
How am I able to represent this?