question

Aly E avatar image
0 Likes"
Aly E asked Braydn T converted comment to answer

scheduling

simulation.fsm how can i dispatch this model using shortest processing time and longest processing time , although each and every product doesn't have it's own processing time, their processing times are dispatched in normal distribution manner ? asap tia

FlexSim 18.0.10
schedulingsptdispatching ruleslptdipatching
simulation.fsm (22.8 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Joshua S avatar image
0 Likes"
Joshua S answered

Can you explain your process a little more? If you want normal distribution, You can select normal distribution, and then in the fields you can reference labels on the flow objects that you can add on their creation.


pic1.png (29.1 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.