@Mischa SpeltIn this model the vessels are unload at a berth when OGV is present. The berth is setup to allow for maximum 2 unloading points. The model runs well initially where both vessels unload at the same time when present at berth. However, at time 217 it is seen that only 1 vessel is unload at 1 time, while the other vessel is simply "on hold" or so it seems. When eventually the vessel that seems to be "on hold" emptied and left, then new vessels that arrives will again unload at the same time.
This sympton is intermittent as it occurs again at time 593. :(
Please advise on what cause the issue and how to overcome it.
The version of FloWorks that I used is FloWorks 19.2.1 with a patch given in