Is it possible to program "processors" to work on a schedule?

Hi! This issue seems to be simple but I don't know how to program it: the model has 3 racks and each rack contains a type of item (identified by a label on previous source). The racks are connected to a Processor. I wonder if it is possible to program the Processor to work on a schedule. This is, the Processor process a kind of item at 8 am (example), then it process other item type as ordered, and so on.

Thanks in advance!