question

Ryosuke S avatar image
0 Likes"
Ryosuke S asked Ryosuke S commented

TE overtaking another TE

I want to control TE with ProcessFlow. The first one travels to A and stops. While the first remains at A, I want to make second TE to travel to B. However I can not seem to make the second one overtake. How can I accomplish this?

Overtake.fsm

FlexSim 20.1.3
flexsim 20.1.3taskexecutorpathagv moduleagv routing
capture003.png (233.2 KiB)
overtake.fsm (33.9 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Jason Lightfoot avatar image
0 Likes"
Jason Lightfoot answered Ryosuke S commented
This post shows a method of redirecting when the allocation to a CP isn't successful. You could replace the lookforwork connections I used with centreport connections or another referencing method.
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Ryosuke S avatar image Ryosuke S commented ·

@jason.lightfoot The post and the sample data I found there was perfect! Thank you!