processflow.fsmHello,
I' got a model - 2 item Types.
Product enters the conveyor - product stops on DP (and it has to be resumed by an operator which walks to the control panel after the item arrives). - how is it possible?
After that the product stops at the end of conveyor, then the operator should check if any of the 3 machines is free, if so he should check if anyone need this product, if so he should put the product on this machine, if don't he should put the product to the right power and free conveyor (based on a product Type). If the machine finishes the process, operator should unload it, and machine should pull the next item type from the right plan, so the operator should load the product from the right conveyor or wait for the arrival of this Type.
How to do it correctly? Should I use the list? Because i don't know how to and I will have the plan in the global table.
Please, I would be really grateful!
Teoretical model in the attachment.