Hello, I'm being asked by a potential FlexSim buyer if I could model a Raymond 9600 swing reach lift truck. In this type of lift:
- The employee goes up with the load
- The truck doesn't rotate to load/unload
- The forks rotate to load/unload
I think I could achieve some kind of visual realism by putting a lift truck inside a lift truck and controlling their movements with a process flow.
BUT before I do that I wanted to do just a simple example where the lift doesn't rotate and stays in the aisle but even that doesn't work because when the lift is connected to AStar it doesn't do its offset travel and so the forks don't rise to unload. See attached simple model.
Any ideas how to solve this seemingly simple issue? (rising forks)
Any way to "ask the forks to rise" when the lift gets to destination but before unloading (while connected to Astar)?
I tried with network nodes instead of Astar but I get the same result.
Thanks,