Hi,
We have found an issue in the AGV network. When we have checked the option Divide by Speed (in the route cost option) the AGV won’t arrive at any control point when it is loaded:
To create this situation, we needed the AGV the have loaded an item and different speeds for loaded vs unloaded. Why does the AGV no longer arrive at the location?
Thank you in advance
Patrick