Now I can assign charging time of AGV by use Time Table.
From photo I use control point to be charge station and add all 30 station to group.
In process flow is be logic of AGV charging. Now the ratio of AGV and Charge Station is 1 : 1.
I want to change the ratio to AGV=30 : Station=24 or 25 and assign priority of AGV charging sort by Battery cap. from Lowest to higher.
I want to know some solution to do this. Thank You