Hello All,
In my model, I want that up to 1000 seconds model run as I map but after that conveyor stopped working and then I want operator2 push the assembly from part loading station to the end. operator will push 2 Assemblies at a time and then return directly to the part loading station to push again 2 assembly. parallelly operator3 will push 2 hangers at a time up to part loading station and then again go to start point and again push 2 hangers.
This will do up to 4000 seconds. after 4000 seconds model will run as I map.
Please find the attached model for referenceoperator push hanger.fsm
Please support as soon as possible.
Thank you so much in advance.