question

Jacob E2 avatar image
0 Likes"
Jacob E2 asked Jason Lightfoot edited

Load & Unload From Same Fixed Resource and then Transport

Hello,

I am wondering if there is a more efficient way to replicate what I am doing in the attached model. Currently, I am using a Separator to unload flowitems from a container flowitem for processing. Once processed, the items are loaded into a Combiner which sits directly on top of the Separator. This is to give the illusion of using one rack to load / unload parts. Once all the items have been processed the cart is wheeled away to a staging area and a new cart of raw material is delivered by the material handler.

Is there a way to accomplish this with ONE Fixed Resource and ONE Rack? I was thinking it might be possible with an Object Process Flow, but I am not sure how?

Model: RotorCNC_Combine&Separate.fsm

1675785024730.png

FlexSim 23.0.1
separatorcombinersunload itemsloadingstaging
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Jason Lightfoot avatar image
1 Like"
Jason Lightfoot answered Jason Lightfoot edited

I've added a BasicFR process flow that will take a single rack - empty the contents through port 2 and receive them back in through port 2. When that's complete it releases the rack through port1.

1675817697702.png

I used an object process flow that processes the rotors individually.

1675817750663.png

You could release more and control the amount with a zone in the subflow if needed.

Model attached:

rotorcnc-combineseparate_jl.fsm



· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jacob E2 avatar image Jacob E2 commented ·
Very nice, @Jason Lightfoot! This is exactly what I was looking for.

Thank you very much!

-Jacob