Hello,
I need to make several tests with different number of operators working on multiple processors controlled by a dispatcher. How can I modify the number of operators that the dispatcher is using and control the number using a parameter?
Is there a way to delete and create "connectionsout" in the dispatcher to operators?
Thanks!