Hello everyone!
I intend to improve the AGV model with a tugger AGV, were aways the AGV drags two wagon whose:
First wagon:
- just loads flowitens with label 1 (gray collor) and unloads only in queue "buffer linha de motores"
- the capacity of this wagon is 16 flowitens
Second wagon:
- loads the flowitens 22, 320, 4100 and 5 (blue, orange, green and white respectively) and unloads only in queue "buffer expedição"
- the capacity of this wagon is 5 flowitens
general rules:
- The AGV pick up the flowitems in queue "buffer de saída" when the capacity for one of the wagons is full. In this moment the AGV pick up every flowitens for each wagon and unload the flowitens in respective queue.
- in queue "buffer linha de motores" the "operator 1" disconected the first wagon.
- in queue "buffer expedição" the "operator 2" disconected the second wagon
- the addictionals wagons is avaiable in "buffer de vagões" and aways that AGV leave the queue "buffer de saída" the operator "ajudante" drags the wagon for the "buffer de saída".
- After each trip of the loaded AGV, the AGV makes an empty trip to pick up the empty wagons and leave them in the "buffer de vagões". so the model have 4 wagons.
I'm young in simulation and I have no idea how to start.
Modelo situação AGV rebocador.fsm