In my complicated circular conveyor system, in my sources I have set labels by percentage at creation of my flow items. These percentages are very important and I would prefer not manipulate them within this source. Each label corresponds to a destination to where the flow item will eventually need to arrive on the conveyor system. After flow item creation I want to send a certain percentage of these flow items to an audit line. After audit the flow item needs to still have it's original label so that when the flow item is re-introduced onto the conveyor that it will then still end up at its correct destination as originally intended. Because the conveyor system is complicated and circular, I do not want this same item to go to audit twice. I am not sure if one can add 2 labels to a flow item in Flexsim then after audit to remove the 2nd label that is the "go to audit label".