WhatsApp Video 2024-11-12 at 12.32.49.mp4Esquema Final.fsm
Hello everyone,
I'm working on a project in FlexSim and need assistance modeling a specific process of assembling and packaging panels on a production line. Below is a detailed description of the workflow:
Operator 1:
- Responsible for initially labeling the plastic bag and Delivers the labeled bag to Operator 2 across a shared worktable. (2 seconds)
- While Operator 2 opens the bag and prepares for packaging, Operator 1 assembles the next panel (base, kit, and cover) and prepares the next plastic bag. (4 seconds)
Operator 2:
- Receives the labeled plastic bag and opens it. (2 seconds)
- Packs the assembled panel into the opened plastic bag and Transports the packaged panel to the sealing machine. (4 seconds)
Both operators work face-to-face, with a shared worktable between them, facilitating a continuous flow of activities.
Operator 3:
- During the sealing process, is responsible for opening and assembling cardboard boxes. (12 seconds)
- Places the sealed panels into the boxes until they reach maximum capacity. (2 seconds)
- Closes, labels, and transports the filled boxes to the stock pallet. (20 seconds)
My questions are:
How can I configure the operators and their specific tasks in FlexSim?
- How do I assign sequential and parallel activities between Operators 1 and 2?
- How can I represent Operator 2 waiting for Operator 1 to finish assembling the panel?
How do I model the shared worktable between Operators 1 and 2?
- Should I use a static resource, or is there a better way to represent this interaction in FlexSim?
What is the best way to synchronize the activities among the operators?
- How can I ensure that Operator 3 starts assembling the boxes while the panels are being sealed?
How can I represent the flow of materials (plastic bags, panels, cardboard boxes) throughout the process?
- Should I use conveyors, queues, or another specific tool in FlexSim?
How do I implement the sealing process and the maximum capacity of the boxes?
- Is there a way to define the box capacity and automate the closing and labeling when they are full?
I would greatly appreciate any help or guidance on how to effectively model this process in FlexSim.
Thank you very much!