I'm working on a model where I have some operator walk times that are part of a standard work time. I would like to find a way to put in these times in a manner where I would tell the operator walk to nodeX in 7 secs, or walk to nodeX in 4 sec then nodeY in 3 sec. What would be a good approach to doing something along these lines?