Hi! Is it possible to reference an Operator from the 3D model to a Resource on Process Flow in such a way that, if I acquire this resource on Process Flow, the Operator on the 3D model will be unavailable to do anything while the resource is acquired? In another situation, for example, can I tell the resource on process flow to travel so the 3D operator will travel?
Thanks!