Controlling a 3D operator by acquiring his referenced resource on Process Flow

Hi! Is it possible to reference an Operator from the 3D model to a Resource on Process Flow in such a way that, if I acquire this resource on Process Flow, the Operator on the 3D model will be unavailable to do anything while the resource is acquired? In another situation, for example, can I tell the resource on process flow to travel so the 3D operator will travel?

Thanks!

FlexSim 16.2.2
process flowoperatorresourceoperator and resource
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Rodrigo Lamas avatar image
0 Likes"
Rodrigo Lamas answered Rodrigo Lamas edited

@Karina Kawka Sim Karina é possivel! Favor verificar em nosso site o link para os materiais em português. Lá você irá achar uma apostila com detalhes e exercícios passo a passo usando ProcessFlow + 3D.

Manual Process Flow - PORTUGUESv01.docx

https://www.flexsim.com/ftp/textbook/supportingmaterials/Portugues/