1906.fsmHi ,
In the given model , I am facing a problem. During transport of part from
1.) ( QueueMain/Rollover1/Rollover2/Rollover3) to (Stall 1, Stall 2 .. .. Stall6) I want 2 operators also to move along with the crane . (i.e Destination Stall Operator should come to the Source Station and take the part in crane and move to Destination with speed equal to that of crane )
2. After Processing in (Stall 1, Stall 2 .. .. Stall6) the part has to be moved to (Oil Pan Sub) . In this case also I need 2 Operators to move along with the crane to Oil Pan Sub and unload the part.
How can we do that ?? Urgently need of help. Tried lot off methods but not working for me.