question

Rohan H avatar image
0 Likes"
Rohan H asked Sam Stubbs answered

AGV Simulation

1)I want to use a process flow for following scenario.

AGV's pickup a pallet and an object at location A, travel to Location B to drop off the pallet and then travel forward to Location C to drop off the object. How do I create an process flow logic for this scenario.

Note:I am able to develop a logic in case the AGV just want to deliver a pallet or an object just one thing at a time.

FlexSim 18.0.3
process flow
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeff Nordgren avatar image Jeff Nordgren commented ·
@Rohan H

That's kind of a broad question. Do you have a model that you can send us so that we can see what is happening in the model?

Thanks.

1 Like 1 ·

1 Answer

Sam Stubbs avatar image
1 Like"
Sam Stubbs answered

I would use a Process Flow to set up logic like this, rather than just rely on port logic. In Process Flow it is fairly simple to control specific tasks (such as your load and unload requirement.)

I've created a small example of how you might go about setting up a system like this.

agv-unload-example.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.