I have a 4 step assembly line with 2 products, A100 and B200, I have to make 1000 of each every day, each product A or B are made in batches of 1000, after the lot is completed it processes the Other product
How can I set-up my simulation so I have a label for each product, so when processor changes products they recognize that it has to do a set-up for a specific product Type
There is a 1 hr set-up when changing from product A to product B, in all 4 processes, how can I setup each processor, so when you are changing to product B then it goes in a 1hr set-up.
How can I set up statistics so it reads how many units of A and B are made