question

ShabDz avatar image
0 Likes"
ShabDz asked Isaac Litster commented

How to make a TaskExecuter move flowitems like a chain?

The TaskExecuter is set to move 4 totes at a time. But as you can see in the picture, it puts the totes at top of each other. How can I set the TaskExecuter to move them like a chain (horizontal line)? Please see the attached model. taskexecuter-chainitems.fsm

FlexSim 17.0.13
queuetask executer
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Isaac Litster avatar image
2 Likes"
Isaac Litster answered Isaac Litster commented

Hi @Amir About

The AGV paths have this logic built into it. If you create an AGV path, you can right click on the path, then click "AGV Network Properties."

Then you can click on the box that says "Attach Loads as Trailer." This will make the TaskExecuter have a "chain" of objects behind it.

I have also attached the model below. Hope this helps!

chain-items.fsm


· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

ShabDz avatar image ShabDz commented ·

Thank you @Isaac Litster. Can I do the same thing using NetworkNode instead of AGV system?

0 Likes 0 ·
Isaac Litster avatar image Isaac Litster ShabDz commented ·

Hi @Amir About

Unfortunately, NetworkNodes are not as compatible with what you are trying to model.You might be able to change the visuals of the objects using process flow, but the downside to that could be that the object would not rotate properly with the TaskExecuter.

1 Like 1 ·