Hello,
i have a problem with sort a box. I would like to a situation, which separator 2 will be sent a grren box to sink 2 and red box to sink 2.
Thank You
Hello,
i have a problem with sort a box. I would like to a situation, which separator 2 will be sent a grren box to sink 2 and red box to sink 2.
Thank You
Your boxes already have a type label, which is either 1 or 2. So to send the items with type 1 through the first output port and items with type 2 through the second, you can use item.Type as the Send To Port expression:
I'm not sure why you have a separator because it is currently just acting as a processor, but even when you split items the Type label will automatically get copied so both items will be sent onto the same conveyor.
6 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved