question

Jirawat J avatar image
0 Likes"
Jirawat J asked Jirawat J edited

Transport and Process Flow

I created the model that allow TS to transfer the item to TE. However, I want to insert more activities for the TS before delivering the item to TE.

As you can see in the picture;

1. I want TS to travel to Queue1 and pick up the item

2. TS unloads the item down to Rack1

3. TS will pick up the item again and travel to the network node in the blue mark

4. TS will push the item to TE

5. TE will travel to sink and release the item, while TS will do the process 1-2 while waiting for TE to come

6. The process flow will run the same as a loop

Here are the attached files

push-pull-container.fsm

FlexSim 19.1.0
flexsim commandsprocess flowtask executertransport
inked1-li.jpg (765.2 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Braydn T avatar image
0 Likes"
Braydn T answered Jirawat J edited

Hey @Jirawat J

I have attached your model with the changes. I added an unload task at the rack, a delay so you could see it there, and then a load and travel to the network node. Let me know if you have any more questions.

push-pull-edit.fsm


push-pull-edit.fsm (272.8 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jirawat J avatar image Jirawat J commented ·

Hi @Braydn T

The model is very helpful. Thank you so much :)

However, what if I want the Transporter to keep on transferring the item, while the Taskexecuter keeps on running around the network node. What should I do?

Ps. I want the Transporter to stop and transfer a item only when the Taskexecuter arrives at the transferred network node

0 Likes 0 ·