In my model, the first item that flows through the process hits every station along the conveyor. However, once the first item is loaded and unloaded by the elevator, regardless of where the other items are at in the process, the elevator will just keep pulling the items in order until all are passed through. Then the process keeps going and once the first item of the next wave comes into the elevator, the same issue occurs. How can I make sure that the items travel to the decision point prior to Elevator1 for them to wait to be loaded?