Hello, I am trying to understand how FlexSim runs production, according to my theoretical output, I am supposed to be getting 46 pieces out of my system in 3600 seconds in a one piece flow (no queues). My math is: (3600/12)*(.80)=240pcs*(.83)=199pcs... and so on (multiplication of all machines' efficiency). Is there a way I can simulate my math and get a total output of 46 at the end? Am I putting the wrong inputs? I used "Breakdown" tabs with the OE being the UPtime and the Downtime column as the Downtime. I am getting an output of 195 pcs even though some of my processors run as low as 68%. Also, I ran a trial with queues to compensate the differences in OE of the machines as a decoupled system and those seem to work fine. 1launch-metrics-no-queues.fsm
CT (Sec) |
100% |
Output 300pcs |
DownTime |
12 | 80% | 240 |
20% |
12 | 83% | 199 | 17% |
12 | 75% | 149 | 25% |
12 | 70% | 105 | 30% |
12 | 80% | 84 | 20% |
12 | 68% | 57 | 32% |
12 | 81% | 46 | 19% |