hi everyone, how can I position the boxes from queue 1 to the rack, following this process flow, randomly?
thanks
hi everyone, how can I position the boxes from queue 1 to the rack, following this process flow, randomly?
thanks
To get a flowitem to move from the queue to the rack you will need to make a port connection from the queue to the rack. To get the flowitem to be placed randomly inside of the rack you will need to change the slot assignment on the rack. I would suggest using the "random" pick list option. I have attached a model that has two custom code activities at the end of your process flow that do the two steps listed above.
The third thing you will need to do is reset the model. This is the only way I have found to get the rack to open it's input port connection. The reason for this is that the rack needs to execute some default code that happens on reset before the input ports will function properly.
I hope this gets you closer to what you want to do. If not, I would suggest posting a new question based on what you are trying to do in general and see if anyone has any ideas on how to approach it differently.
Brandon
For whatever reason I couldn't include the attatchment with the last response.
14 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved