transport three different box to the corresponding 3 sink in the pattern of AGV.

I want to transport three different box to the corresponding 3 sink in the pattern of AGV., and get the time spent. the number of each kind of box >1, so AGVs need to to be recycled for transportation.

model-help.fsm

FlexSim 19.0.0
agvflexsim 19.0.0
1621256878120.png (87.6 KiB)
model-help.fsm (33.5 KiB)
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Wang Yang avatar image Wang Yang commented ·

Because of copyright issues, I suggest you use the latest version of V2021 for study and research.

1 Like 1 ·
Lv GG avatar image Lv GG Wang Yang commented ·

好的,谢谢

0 Likes 0 ·
Eric M avatar image Eric M commented ·

Please contact our Chinese partner, BJCSN. They can provide you with direct assistance.

为了更好更快速的解决您的问题,可以联系我们当地中国区合作伙伴 (北京创时能),他们会为您提供专业的FlexSim技术答疑.

contact information / 联系方式:
[email protected] / [email protected]
QQ: 1093796825
@CSN

0 Likes 0 ·

1 Answer

Steven Hamoen avatar image
1 Like"
Steven Hamoen answered Lv GG commented

The solution was very simple. I attach the model, but the idea is that you make connections to the sinks and use a dispatcher to send the tasks to the AGV. Only problem is that you see that your AGV path is not correct because there is a circular wait problem.

model-help_tal.fsm


model-help-tal.fsm (34.4 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Lv GG avatar image Lv GG commented ·

Thank you very much. As you said, there will be deadlock in the model now. If I don't change the path setting, is there any way to solve the deadlock problem?

0 Likes 0 ·