Suggestion: Create a visual indicator bar to show completion level

The idea is to have an object in the 3D library which shows the completion level of an associated process to which it is attached. It would be similar to a download percentage indicator. See attached example I created using a plane and a text object controlled by a simple process flow:

indicator-bar.gif

By the way, I couldn't find how to post this as an idea instead of a question.

FlexSim 21.1.5
flexsim 21.1.5idea
indicator-bar.gif (3.7 MiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Matthew Gillespie avatar image Matthew Gillespie ♦♦ commented ·

To post an idea:

1628886983873.png

1 Like 1 ·
1628886983873.png (6.4 KiB)

1 Answer

·
Patrick Cloutier avatar image
0 Likes"
Patrick Cloutier answered
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.