Hello
I have a project where I use 20 AGV`s responsible for transporting aprox. 100 materials . The materials are consumed by Processors and ordered once the process is ready . I have built the simulation standard(no process flow) using a dispatcher with prioritizing by distance .
What I am expecting from the simulation and it does not happen is that the AGV once it unloads a material to re-evaluate his current position and go load the material closest to him .
Does anybody know how to solve it in the current format ? I have already spent a lot of time finishing building the model and the only problem is this travelling .
I am attaching a simplified model as an example .