Slot Over Assignment.fsmIn the attached model, I have a part that is actively being moved to a floor storage spot and while that is in progress, another part is assigned to that same slot. I need to only have 1 part per slot. How do I adjust this so that a slot is considered unavailable after it has been assigned to a part instead of waiting for the part to arrive?