Hey Guys,

I'm having a problem with my file using process flow, in this case I would like my file to load only after my pallet with 60 items is ready, but I end up getting an error when loading. Can anyone take a look and see where I'm going wrong?

1686081847489.png


arquivoforum123.fsm


FlexSim 21.2.4
agvprocess flowagv load
1686081847489.png (12.1 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Julie Weller avatar image
0 Likes"
Julie Weller answered Julie Weller commented

Hi @kauan pedroso! It was just a syntax error, on your sources you spelled it "First available" instead of "First Available". Additionally I think you misspelled "Item Container" (maybe with an extra space) in the Load in your subflow. In the future, I would just use the little black drop down arrow to select names as it just helps to avoid syntax errors.

· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

kauan pedroso avatar image kauan pedroso commented ·

Hello @Julie Weller !

I made the change you just gave me but I still have problems loading my pallet. Is there anything else I need to fix?

1686139639352.png

arquivoforum123.fsm



0 Likes 0 ·
1686139639352.png (19.1 KiB)
Julie Weller avatar image Julie Weller kauan pedroso commented ·

Okay I looked at your model. It seems the error was a misunderstanding between process flow vs 3D model, regarding which controls the model.

You can do everything in process flow, but the combiner object was already setting the batch size so the process flow batch activity was just messing up your model and leaving a box left behind. Additionally, after the combiner combines an object, it become just 1 flowitem. You also don't need the subflows as it will automatically send the whole pallet to the AGV (because they're all one item) so you can move the Load and Unload straight into your process flow. Your labels were a little bit strange as well in your process flow.

Another issue was you were sending the pallet of items via AGV and also via an 'A' connection from your combiner to the processor which was messing up the AGV system. There were some other weird syntax errors, so just choose things exclusively using the black arrow drop down menu.

Here's the model for reference! I hope that helps.

arquivoforum123 help.fsm

0 Likes 0 ·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.