Control Transporter when idle

Hello, Flexsim community, I've received help from the community, and I have a Flexsim model, version 2019, which I have attached. I'm facing an issue where I want Transporter1 to work together with Transporter2 to move items from Queue3, 4, 5, and 6 to the Sink when Transporter1 is "idle". Additionally, Transporter1 should still follow the settings in the FixResource when a task requires it. I've attached the Flexsim file version 2019 for your reference. I really appreciate and hope for your assistance.

Besgard,

laitriminh

Process Flow.fsm

FlexSim 19.0.0
transporterprocesss flowlist pullfixed resourceidle
process-flow.fsm (43.2 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered laitriminh commented

Connect the queues 3-6 to a dispatcher and the dispatcher to both forklifts.

In the Process Flow, instead of giving individual tasks to the forklift, combine them into a task sequence with a higher priority than the tasks generated by queue 3-6.

process-flow(1).fsm