question

Eddie avatar image
0 Likes"
Eddie asked Jeanette F commented

AGV Index Parking Spots

My layout is a bit complicated, but I have a process where there are 8 charge control points labeled Chg1-8 (circled in blue). Charge points Chg4-8 are in a line and need to index forward as the AGVs are called for and leave charge point Chg8 to go to control points labeled Load1 and Load2 (circled in red). After being called for AGVs get sent to control points labeled Quad1-5 (circled in green) and drop off the parts that were loaded and return to charge points Chg4-8. Once parts are finished in Quad1-5 AGVs are called for again from charge point Chg8 and sent to the three control points at the top labeled Finish (circled in purple) passing through the center aisle with charge points Chg4-8.


I need the AGVs to park at Chg4-8, wait for a process to call them from Chg8 and index forward in line after the AGV leaves Chg8 and not just continuously circle around.

I've been trying to figure it out with AGV with Basic Parking, but I can't seem to get things to work as intended. When I set all points Chg1-8 as parking points the sim freezes up. I tried setting only Chg 1,2,3, & 8 and Chg point with work forwarding at Chg8 and Chg1, but the sim freezes after only picking up one item. I've attached a version of the sim that works, but has the AGVs just continuously circling the route.


I also tried using a dispatcher instead of the AGV process flow template, also attached. It moves how I want, but I don't know how to incorporate Chg 1-3 as parking spots.

32375 Sim.fsm

32375 Sim with Dispatcher.fsm

FlexSim 24.0.3
agvparking pointindexingagv with basic parking
· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Eddie avatar image Eddie commented ·

capture-1.png

Here's the layout with the paths color coded. Wouldn't fit in my original post.

0 Likes 0 ·
capture-1.png (164.2 KiB)
Jeanette F avatar image Jeanette F ♦♦ commented ·

Hi @Eddie, was Jason Lightfoot's answer helpful? If so, please click the "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always comment back to reopen your question.

0 Likes 0 ·

1 Answer

Jason Lightfoot avatar image
0 Likes"
Jason Lightfoot answered

I would send each AGV to Chg 8 when it is free and when it arrives at Chg8 pull the jobs from the list (it will wait at Chg 8 if there are no jobs). You could additionally set the charge rate when the AGV arrives/leaves the Chg 4-8 Control Points

5 |100000