question

flexsimuser0801 avatar image
0 Likes"
flexsimuser0801 asked Jeanette F commented

Dwell Point in AGV system

My AGV should return to the elevator (or source queue in this case) when it completes its storage or retrieval request. How can I implement this in the existing process flows?

FlexSim 22.2.4
agvagvpathagvcontrolagvrouting
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered

There are picklist options for trigger called On Resource available. You can let a Taskexecuter travel to coordinates or objects.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.