I'm working on a system where I have 10 machines with 4 possibilities of path for each one ; so its 40 paths ; the system actually has 2 operators who do the transport ; i already did the simulation of that ; my study is on changing the operators with one agv (it can be possible cz the output time of each machine is totally different with the others)
My question is : does the only way to make the simulation is to draw the 40 different path or there is another solution