"Is it possible to set up the production line so that it stops when there is a failure at one of the workstations, and then resumes production after the failure is repaired?.The problem is that during a failure at one of the workstations, the previous workstations continue to operate normally, creating a queue of items for production. I want to stop this during the repair of the failure.