Hi,

I'm creating a production process in Flexsim 23. I'm having trouble setting up a process flow to have two operators perform the same action one after the other, in what I call a “chase scenario.” Should I make two separate windows or one common window? If one common one, how to designate that Op1 and Op4 will perform all set tasks in sequence.

Part of the process flow below, where they work separately, and the idea would be for them to take turns performing this tasks, one after the other.

1737130465580.png

Thnak you in advance for support and all ideas.


FlexSim 23.1.4
process flowoperatorstask sequencing in process flow
1737130465580.png (58.8 KiB)
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

0 Answers