Hi there,
I have a simulation of a production and assembly line. it starts with the raw material of one part being delivered to the entry of the system, and ends with the sink after the assembly line.
how can i count the throughput time of ONE flow item, the waiting time and the process time? all of these 3 numbers should have minimum, maximum and average.
thanks in advance.