Hello,

I'm trying to use 2 operators to transport an item for a Queue to a processor. I'm working with FlexSim 7 and I have the option:

/**Coordinated Task Sequence Example 2* This example shows the code that is required to create a coordinated tasksequence that 
calls for two operators to transport the same flowitem together.*/

But it doesn't work. I don't know if I have to activate another options.

task sequencing in process flow
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jordan Johnson avatar image
0 Likes"
Jordan Johnson answered Jordan Johnson edited

Also, see this question. It deals with two operators carrying one item:

https://answers.flexsim.com/questions/45647/how-to-use-more-than-one-operator-to-carry-out-sam.html

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

David Seo avatar image
0 Likes"
David Seo answered David Seo edited
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.