I want that one operator follow the second item across the conveyor until reach the union with the other.
thanks
I want that one operator follow the second item across the conveyor until reach the union with the other.
thanks
There's not really a simple way to have an Operator "follow an item" along a conveyor. What you could try to do is set up a series of DP along the conveyor, and create some custom Travel task sequences that force the Operator to travel to the certain DPs along the conveyor at the same time the item is moving, thus mimicking the idea that the Operator is following an item.
I've created a small example in Process Flow, that might help you. You'll notice the two things to get this to work is first having them in sync; and second (related to the first issue) is having the Operator travel at the same speed as the conveyor's speed. (So he won't rush ahead or fall behind.) To resolve these issues, we first need to stop the item along the conveyor, until the Operator can reach the destination, and then we change the Operator's "maxspeed" variable to match the conveyor's speed.
Here's the example:
thanks Sam,
Your idea help me. Finally i use a network nodes to make all the path around the conveyor to have the diferents movements. similar that you make.
11 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved